Delegate your business needs with us and we will serve you candidly”

 – SALEH HADI HAIDER

Building Successful Businesses Since 1974

NoClientDescriptionYear
1Royal CommissionEPC of 115KV Power Lines for Maritime Yard (English )05.04.2018
2KhalidiyahInstallation of 115KV UnderGround Cables for the Integration of the Khalidiyah -2 115/13.8KV S/S01.08.2017
3Ain MurjanInstallation of 115KV UnderGround Cables for the Integration of the Ain Murjan 115/13.8KV S/S01.08.2017
4Arar ProjectReinforcement of 132KV DC OHL network in Al Dhahiyah S/S in Arar Area17-Apr-17
5NATIONAL GRIDNew DSM-Dynamic System Monitors at Transmission Substations in National Graid SA8-Dec-16
6Retrofitting in EOARetrofitting and Replacement of OPGW along 230KV and 380KV Transmission Lines in EOA14-Jul-16
7East DammamInstallation of 115 KV U/G Cables for the Integration of East Dammam Housing Development 115/13.8Kv S/S29-Jun-16
8FaisiliyahInstallation of 115KV Underground cables for the Integration of Faisiliyah 2 115/13.8 KV Substation30-Dec-15
9North DammamIntegration of North Dammam 1 BSP to the Existing Network30-Dec-15
10AziziyahInstallation of 115KV Underground cables for the Integration of Aziziyah 3 115/13.8 KV Substation30-Dec-15
11Die 4CInstallation of 115KV Underground cables for the Integration of Die 4C 115/13.8 KV Substation29-Dec-15
12Al OulaInstallation of 115KV Underground cables for the Integration of Al-Oula 115/13.8 KV Substation30-Dec-15
13Ras Al Khair PumpConstruction of 115KV DC OHTL from Ras Al Khair Pump Station 2 to As Sarrar 2 S/S3-Sep-15
14Qaryat AL UlyaConstruction of 115kv double circuit OHTL for interconnection of Qaryat Al-Ulya-2 115/13.8kv substation.28-May-15
15MazroeyahInstallation of 115KV UnderGround Cables for the Integration of the AL-Mazroeyah 115/13.8KV S/S5-Mar-15
16KhalidiyahInstallation of 115KV UnderGround Cables for the Integration of the Khalidiyah -2 115/13.8KV S/S5-Mar-15
17Ain MurjanInstallation of 115KV UnderGround Cables for the Integration of the Ain Murjan 115/13.8KV S/S5-Mar-15
18Qatar RoadConstruction of 115kv double circuit Overhead Transmission line for interconnection of Qatar Road 115/13.8kv substation.5-Mar-15
19KFIAReplacement of 69 kv U/G Cable in EOA10 SEP.2014
20AbhaRetrofitting of old OPGW/OGW Southern Sector29 MAY.2014
21SEC-COAUPGRADE AND ADD NEW READINGS TO SCADA SYSTEM AT DISTRIBUTION SUBSTATION IN RIYADH CITY27-May-14
22Scada - RiyadhUp Grade and Add New Readings To The Scada System Riyadh City22 MAY.2014
23DomahSOE Replacement At Domah-A S/S And New DSM Installation At Skaka-C S/S In Al Jouf Area3-Apr-14
24Die 6BInstallation of 115KV UnderGround Cables for the Integration of the 2nd DIE-6B 115/13.8KV S/S17-Apr-14
25DohaIntegration Of Doha 380/230/115kv BSP To The Existing 115 Kv Network26-Mar-14
26AwamiaReplacement Of 69kv U/G Cables Between Awamia S/S And Tarut S/S20 OCT. 2013
27HaielReinforcement Of 132kv Network In COA (OHTL Portion)29 SEPT.2013
28ArarConstruction Of New 132kv Dc OHTL For Al-Dhahiyah S/S In Arar City29 SEPT.2013
29Abu WroodConstruction Of 132 DC OHTL For S/S 8860 In Abu Al-Wrodd, Qassim Area29 SEPT.2013
30Unified Contract For Distribution Networks Up To 36 Kv22 SEPT.2013
31Replacement/Retrofitting Of Old OPGW/OPGW In Company-EOA12 SEPT.2013
32Unified For Distribution Networks Up To 36 Kv1 SEPT.2013
33NATIONAL GRIDRTU replacement in Central and Upgrade of CMU17-Jun-13
34KaustConstruction Of 110kv OHTL For 110/13.8kv Kaust-2 Substation24 MAR.2013
35ThuwalConstruction Of 110kv OHTL For Thuwal Town 110/13.8kv Substation25 FEB. 2013
36Hafar Al BatinConstruction Of 115/13.8kv Overhead Transmission Line To Hafar Al-Batin Substation-716 MAY.2012
37JalawiyahReinforcement Of Power Supply To Al-Jalawiyah And Ash-Shate-2 115/Kv S/S (OHTL Portion)16 MAY.2012
38Khobar LakesPower Supply To Khobar Lakes(OHTL & UG Cable Portion)16 MAY.2012
39Retrofitting OPGW in SEC-CTA (COA & EOA)24 JAN. 2012
40Retrofitting OPGW/OPGW with New 48 Cores OPGW in SEC DTA And WOA25 JUN.2011
41ModonDie 115/13.8 kV Substation - 4A in Dammam 2nd Die (115 kV Underground Cable Portion)14 MAY.2011
42Al HassaReplacement of 115kv Line Wood Pole Structures Crossing Highways in Al-Hassa area30 MAR.2011
43AgrabiyahReplacement Of Old 69kv U/G Cables Between East Airport S/S and Agrabiyah S/S & Khobar Housing S/S and Aziziah S/S10 JAN.2011
44Talemi69KV U/G TO Talemi S/S, Youth Center S/S And Fiber Optic Cable To Skaka Industrial S/S.16 MAY.2010
45Saudi Elecrticity Company-COAInstallation of New Transducer in 9 Substations.2006-07
46Saudi Elecrticity Company-COAReplacement of Transducers 380/132KV- 40 Substations .2007-08
47Capital LightsImplementations SCADA and Telecom System for S/S # 77232006

Our Strength

Our manpower strength

%

Employee increase per year

AHC Inhouse Equipments