No | Client | Description | Year |
---|---|---|---|
1 | Royal Commission | EPC of 115KV Power Lines for Maritime Yard (English ) | 05.04.2018 |
2 | Khalidiyah | Installation of 115KV UnderGround Cables for the Integration of the Khalidiyah -2 115/13.8KV S/S | 01.08.2017 |
3 | Ain Murjan | Installation of 115KV UnderGround Cables for the Integration of the Ain Murjan 115/13.8KV S/S | 01.08.2017 |
4 | Arar Project | Reinforcement of 132KV DC OHL network in Al Dhahiyah S/S in Arar Area | 17-Apr-17 |
5 | NATIONAL GRID | New DSM-Dynamic System Monitors at Transmission Substations in National Graid SA | 8-Dec-16 |
6 | Retrofitting in EOA | Retrofitting and Replacement of OPGW along 230KV and 380KV Transmission Lines in EOA | 14-Jul-16 |
7 | East Dammam | Installation of 115 KV U/G Cables for the Integration of East Dammam Housing Development 115/13.8Kv S/S | 29-Jun-16 |
8 | Faisiliyah | Installation of 115KV Underground cables for the Integration of Faisiliyah 2 115/13.8 KV Substation | 30-Dec-15 |
9 | North Dammam | Integration of North Dammam 1 BSP to the Existing Network | 30-Dec-15 |
10 | Aziziyah | Installation of 115KV Underground cables for the Integration of Aziziyah 3 115/13.8 KV Substation | 30-Dec-15 |
11 | Die 4C | Installation of 115KV Underground cables for the Integration of Die 4C 115/13.8 KV Substation | 29-Dec-15 |
12 | Al Oula | Installation of 115KV Underground cables for the Integration of Al-Oula 115/13.8 KV Substation | 30-Dec-15 |
13 | Ras Al Khair Pump | Construction of 115KV DC OHTL from Ras Al Khair Pump Station 2 to As Sarrar 2 S/S | 3-Sep-15 |
14 | Qaryat AL Ulya | Construction of 115kv double circuit OHTL for interconnection of Qaryat Al-Ulya-2 115/13.8kv substation. | 28-May-15 |
15 | Mazroeyah | Installation of 115KV UnderGround Cables for the Integration of the AL-Mazroeyah 115/13.8KV S/S | 5-Mar-15 |
16 | Khalidiyah | Installation of 115KV UnderGround Cables for the Integration of the Khalidiyah -2 115/13.8KV S/S | 5-Mar-15 |
17 | Ain Murjan | Installation of 115KV UnderGround Cables for the Integration of the Ain Murjan 115/13.8KV S/S | 5-Mar-15 |
18 | Qatar Road | Construction of 115kv double circuit Overhead Transmission line for interconnection of Qatar Road 115/13.8kv substation. | 5-Mar-15 |
19 | KFIA | Replacement of 69 kv U/G Cable in EOA | 10 SEP.2014 |
20 | Abha | Retrofitting of old OPGW/OGW Southern Sector | 29 MAY.2014 |
21 | SEC-COA | UPGRADE AND ADD NEW READINGS TO SCADA SYSTEM AT DISTRIBUTION SUBSTATION IN RIYADH CITY | 27-May-14 |
22 | Scada - Riyadh | Up Grade and Add New Readings To The Scada System Riyadh City | 22 MAY.2014 |
23 | Domah | SOE Replacement At Domah-A S/S And New DSM Installation At Skaka-C S/S In Al Jouf Area | 3-Apr-14 |
24 | Die 6B | Installation of 115KV UnderGround Cables for the Integration of the 2nd DIE-6B 115/13.8KV S/S | 17-Apr-14 |
25 | Doha | Integration Of Doha 380/230/115kv BSP To The Existing 115 Kv Network | 26-Mar-14 |
26 | Awamia | Replacement Of 69kv U/G Cables Between Awamia S/S And Tarut S/S | 20 OCT. 2013 |
27 | Haiel | Reinforcement Of 132kv Network In COA (OHTL Portion) | 29 SEPT.2013 |
28 | Arar | Construction Of New 132kv Dc OHTL For Al-Dhahiyah S/S In Arar City | 29 SEPT.2013 |
29 | Abu Wrood | Construction Of 132 DC OHTL For S/S 8860 In Abu Al-Wrodd, Qassim Area | 29 SEPT.2013 |
30 | Unified Contract For Distribution Networks Up To 36 Kv | 22 SEPT.2013 | |
31 | Replacement/Retrofitting Of Old OPGW/OPGW In Company-EOA | 12 SEPT.2013 | |
32 | Unified For Distribution Networks Up To 36 Kv | 1 SEPT.2013 | |
33 | NATIONAL GRID | RTU replacement in Central and Upgrade of CMU | 17-Jun-13 |
34 | Kaust | Construction Of 110kv OHTL For 110/13.8kv Kaust-2 Substation | 24 MAR.2013 |
35 | Thuwal | Construction Of 110kv OHTL For Thuwal Town 110/13.8kv Substation | 25 FEB. 2013 |
36 | Hafar Al Batin | Construction Of 115/13.8kv Overhead Transmission Line To Hafar Al-Batin Substation-7 | 16 MAY.2012 |
37 | Jalawiyah | Reinforcement Of Power Supply To Al-Jalawiyah And Ash-Shate-2 115/Kv S/S (OHTL Portion) | 16 MAY.2012 |
38 | Khobar Lakes | Power Supply To Khobar Lakes(OHTL & UG Cable Portion) | 16 MAY.2012 |
39 | Retrofitting OPGW in SEC-CTA (COA & EOA) | 24 JAN. 2012 | |
40 | Retrofitting OPGW/OPGW with New 48 Cores OPGW in SEC DTA And WOA | 25 JUN.2011 | |
41 | Modon | Die 115/13.8 kV Substation - 4A in Dammam 2nd Die (115 kV Underground Cable Portion) | 14 MAY.2011 |
42 | Al Hassa | Replacement of 115kv Line Wood Pole Structures Crossing Highways in Al-Hassa area | 30 MAR.2011 |
43 | Agrabiyah | Replacement Of Old 69kv U/G Cables Between East Airport S/S and Agrabiyah S/S & Khobar Housing S/S and Aziziah S/S | 10 JAN.2011 |
44 | Talemi | 69KV U/G TO Talemi S/S, Youth Center S/S And Fiber Optic Cable To Skaka Industrial S/S. | 16 MAY.2010 |
45 | Saudi Elecrticity Company-COA | Installation of New Transducer in 9 Substations. | 2006-07 |
46 | Saudi Elecrticity Company-COA | Replacement of Transducers 380/132KV- 40 Substations . | 2007-08 |
47 | Capital Lights | Implementations SCADA and Telecom System for S/S # 7723 | 2006 |